Phase One · Dexter–Linwood · Active predevelopment

A controlled start built to reach construction.

Three controlled properties. Two new duplexes. One rehabilitation. Six proposed family-oriented homes—and a clear line between what is established and what still must be diligenced.

Conceptual streetscape of historically compatible Iron Oak duplexes
Conceptual Phase One streetscapeFinal design subject to diligence and approvals
3Controlled properties
6Proposed homes
2 + 1New duplexes + rehabilitation
ActivePredevelopment stage

Why this first phase

Focused enough to manage. Significant enough to establish a track record.

Phase One is how Iron Oak will establish its development track record before expanding to additional blocks.

Its job is to establish a repeatable development system: clear site control, defensible scope, supportable financing, disciplined construction, stable lease-up, and long-term ownership.

Historically compatibleFamily-orientedAccessible by designLong-term stewardship

Proposed development program

Three buildings. Six homes. One coordinated closing strategy.

The public page intentionally omits exact property numbers. Detailed site information can be shared with qualified partners as appropriate.

Proposed Phase One development components and status
ComponentDeliveryHomesIllustrative programCurrent status
New duplex ANew construction2Family-oriented · illustrative 2–3 BR mixPredevelopment
New duplex BNew construction2Family-oriented · illustrative 2–3 BR mixPredevelopment
Existing duplexRehabilitation2Family-oriented · final scope pending diligenceScope validation

All unit counts, bedroom mixes, affordability levels, accessibility features, costs, and schedules remain subject to final design, zoning, underwriting, environmental review, and program approvals.

Lender-facing readiness

What is established—and what still has to close.

Credibility comes from naming the unresolved work early and assigning each issue a path to resolution.

  1. 01Established

    Site control

    Three Phase One properties are controlled, creating a focused starting point for design and financing.

  2. 02Active

    Project definition

    The concept is defined. Architecture, engineering, scope, and cost validation must convert it into construction documents.

Risk discipline

The first phase should reduce uncertainty before it consumes capital.

These controls describe Iron Oak's intended management approach. Final requirements will be set with lenders, agencies, and the professional team.

01

Construction cost

Risk
Early concepts can outrun achievable rents and financing.
Control
Design to budget, independent pricing, value engineering, and a visible contingency policy.
02

Permanent takeout

Risk
Construction leverage can exceed debt supported by stabilized net operating income.
Control
Size permanent debt first; close the remaining gap with committed subsidy, subordinate capital, and equity.
03

Site + approvals

Risk
Unknown conditions or delayed approvals can disrupt schedule and cost.
Control
Maintain a diligence tracker, assign accountable leads, and clear closing conditions before mobilization.
04

Delivery capacity

Risk
A first project requires disciplined reporting and experienced execution support.
Control
Use qualified third-party design, construction, legal, and financial partners with defined responsibilities.

Design direction

Respect the block. Improve the building performance.

The current concept prioritizes historically compatible massing, family-sized homes, stepless access where feasible, adaptable first-floor features, alley access, covered parking, and usable green space.

Photography status: owner-provided site and property photography will replace or supplement concept imagery once approved for public release.

Illustrative Calvert and Collingwood corridor plan showing homes, alley access, carports, and green space
Illustrative planning vision · Not a survey or approved site plan

Partner pathways

Enter the project where your capacity matters most.

Each path opens a structured email so Iron Oak can respond with the right materials and next-step conversation.

01Lenders + CDFIs

Structure responsible leverage

Help size construction and permanent debt, define closing conditions, and align reporting with credit requirements.

Start this conversation
02Public + mission capital

Close the feasibility gap

Align subsidy, subordinate financing, technical assistance, and affordability requirements with a financeable first phase.

Start this conversation
03Design + delivery partners

Turn concept into bid-ready scope

Advance architecture, engineering, environmental review, cost validation, permitting, and construction planning.

Start this conversation

Qualified partner materials

Request the current Phase One package.

The response can be tailored to a lender, public agency, technical-assistance provider, design professional, or construction partner.

Current discussion materials may include:

  • Project and ownership summary
  • Proposed scope and design assumptions
  • Readiness and diligence status
  • Capital-stack questions and partnership needs
Request the packageMaterials are shared according to audience, confidentiality, and project readiness.

Phase One partnership

Move the next closing condition forward.

Tell Iron Oak who you represent, the role you can play, and the best next step.